How to Start an Activewear Project with Ohsure: From Inquiry to Delivery
- Share
- Issue Time
- Aug 10,2026
Summary
A practical, evidence-based guide to starting a custom activewear project with Ohsure—from the first inquiry and sample brief through approval, bulk production, inspection, shipping and after-sales follow-up.

Direct answer
To start a custom activewear project with Ohsure, a buyer should send a clear product brief, reference images or a tech pack, estimated quantities by style and color, sizing, fabric and branding requirements, destination market and target delivery date. Ohsure’s published workflow then moves through requirement review, material and color decisions, sampling, buyer approval, bulk quotation and deposit, material purchasing, production, inspection, balance payment, shipping and after-sales follow-up. Timelines and commercial terms must be confirmed for the actual project because Ohsure’s public pages show different indicative ranges and do not establish one universal schedule.
This guide translates the workflow currently described on Ohsure’s website into buyer decisions and approval checkpoints. It explains what normally happens at each stage, what information the buyer controls and what should be recorded in writing before the project advances.

The Ohsure project workflow at a glance
| Stage | Main factory activity | Buyer decision or input | Written record to keep |
|---|---|---|---|
| 1. Inquiry | Reviews the product direction and requirements | Product, market, quantity, budget and deadline | Initial brief and open-question list |
| 2. Development plan | Recommends materials, colors, logo methods and sample route | Selects the options to test | Sample scope, fee, timing and revision terms |
| 3. Sampling | Develops the pattern, sources sample material, applies branding and sews the sample | Reviews fit, construction, appearance and performance | Dated feedback and version log |
| 4. Approval and order | Prepares the bulk quotation and order documents | Approves the final reference, quantities and commercial terms | Approved sample, specification, quotation and pro forma invoice |
| 5. Material preparation | Purchases fabric, trims, labels and packaging | Approves lab dips, strike-offs or substitutions where required | Material and color approvals |
| 6. Bulk production | Cuts, decorates, sews, finishes and follows production | Responds to documented exceptions or change requests | Production updates and change approvals |
| 7. Inspection and packing | Checks the finished order and prepares packaging | Reviews inspection evidence and shipping marks | Final inspection and packing records |
| 8. Delivery and follow-up | Arranges the agreed shipping method after payment conditions are met | Confirms consignee, documents and receipt | Shipping documents and arrival report |
This sequence is a planning framework based on Ohsure’s published service pages. The actual contract, payment terms, inspection scope and transfer of risk depend on the quotation and agreed trade terms.
Step 1: Send a brief that can be evaluated
Ohsure’s contact page asks buyers to identify the product category and submit inquiry information. Its custom-service pages also ask for design drawings or style references, fabric and color preferences, size, logo requirements and printed patterns where relevant.
A useful first brief should include:
- Company, sales channel and destination market
- Intended wearer, activity and use conditions
- Product category, silhouette and reference images
- Tech pack or measurement chart, if available
- Estimated quantity by style, color and size
- Fabric composition, weight, stretch, hand feel and performance targets
- Logo artwork, placement, dimensions and preferred application method
- Labels, hangtags, packaging, barcode and shipping-mark requirements
- Required testing, labeling or destination-market compliance
- Target sample date, launch date and delivery location
- Target price range with the expected cost basis identified
Reference images should be labeled as inspiration or as a controlled specification. If the buyer owns a complete tech pack, the factory can review an OEM-style route. If the product is still a concept, more ODM-style development may be needed before an accurate bulk quotation is possible.
Step 2: Confirm the development and sample scope
Before sampling begins, the buyer and supplier should resolve which details are fixed, which details are options and which details still require testing. Ohsure publishes support for fabric selection, custom colors, multiple logo processes, private labels, hangtags, packaging and accessories. The service page states that custom colors may require a lab dip before bulk dyeing.
The sample agreement should identify:
- Sample type and purpose
- Fabric source and whether the sample uses exact or substitute material
- Color standard or lab-dip process
- Pattern source and size used for the first sample
- Logo method, artwork version, placement and dimensions
- Labels, trims and packaging included in the sample
- Sample fee, freight and payment method
- Estimated completion date and shipping method
- Number of included feedback or revision rounds
- Ownership and return terms for patterns, molds or development assets
Ohsure’s public pages currently show different indicative sampling statements: the homepage refers to approximately 7–12 days, some service content states 7–10 days and another workflow states completion within 15 days. These figures should be treated as page-level guidance, not a guaranteed schedule. Ask for the date after Ohsure checks the design complexity, material availability and sample-room workload.

Step 3: Review the sample as a controlled product version
Ohsure states that its team records sample requirements, follows the sample order, checks completed samples, photographs them before shipping and keeps a reserved sample for comparison with bulk production.
The buyer should review more than appearance. A structured sample review can cover:
- Identity: style code, version, color, size and date.
- Measurements: actual results against the measurement chart and tolerance.
- Fit: intended body, activity, ease, rise, length, support and movement.
- Construction: seams, stitch type, reinforcement, lining, elastic and edge finishing.
- Materials: composition, weight, stretch, recovery, opacity, hand feel and shade.
- Branding: logo method, placement, dimensions, color and durability.
- Function: range of motion, pocket use, closures, nursing access or maternity accommodation where relevant.
- Labels and packaging: content, position, warnings, folding and pack-out.
Feedback should use one consolidated, dated document with photographs and measurable instructions. Avoid approvals such as “looks fine” when the bulk order will depend on the sample. Record whether approval is unconditional, conditional on listed corrections or limited to only part of the product.
Step 4: Freeze the bulk order before paying the deposit
Ohsure’s published workflow places the bulk quotation and invoice after sample approval. It then describes deposit receipt, internal contract and production-sheet review, material purchasing and production based on the reserved sample.
Before releasing the bulk order, confirm that the quotation or order documents state:
- Style, color and quantity by size
- Approved sample or version reference
- Final bill of materials and approved color standards
- Logo, label, hangtag, packaging and carton details
- Unit price and included cost items
- Sample, testing, tooling, packaging and freight charges
- Currency, payment schedule and bank beneficiary
- Trade term, delivery point and shipping responsibility
- Production lead time and the event that starts the clock
- Inspection method, defect definitions and measurement tolerances
- Policy for shortages, overages, repairs, replacements and claims
- Rules for substitutions, changes and buyer-caused delays
This order freeze is the transition from development to repeatable manufacturing. Any later change to fabric, pattern, logo, quantity or packaging can affect price, MOQ and delivery, so changes should be documented rather than handled only through informal chat.
Step 5: Approve materials and pre-production controls
After the deposit and internal order review, Ohsure describes purchasing fabric, accessories, tags and shipping marks. Before cutting begins, order-specific controls may include lab-dip approval, print or embroidery strike-off approval, fabric inspection, shrinkage testing, a size-set sample or a pre-production sample.
Not every project requires every approval. The buyer should ask which controls apply and who can authorize a deviation. If bulk fabric differs materially from the development sample, the supplier should disclose the difference and obtain written approval before production.
Step 6: Follow bulk production by milestones
Ohsure’s pages describe production after materials reach the workshop, merchandiser follow-up, sales updates and quality checks through the manufacturing process. A useful update is tied to an observable milestone rather than a general percentage.
Recommended milestones include:
- Bulk material received and inspected
- Color and decoration approvals complete
- Cutting released
- First output reviewed
- Sewing in progress
- In-line issues and corrective actions recorded
- Finishing and measurement checks under way
- Final inspection complete
- Packing and carton marks verified
Published production-time statements also vary. The homepage promotes bulk production in 15–20 days, while another Ohsure sportswear page lists 20–35 days plus 3–5 days for final inspection and packing. The order schedule should therefore state the exact start condition, buyer approval deadlines, factory production window and shipping handover date.
Step 7: Define inspection before the order is finished
Inspection cannot be evaluated consistently unless the standard is agreed before production. The approved sample is important, but it should be supported by measurable specifications.
The final inspection plan can identify:
- Inspection party and timing
- Sampling method or whether every piece is checked
- Critical, major and minor defect definitions
- Measurement points and tolerances
- Shade and appearance standard
- Stitching, seam and decoration checks
- Functional and performance tests
- Label, packaging, assortment and carton checks
- Required photographs, reports and corrective-action evidence
- Conditions for release, rework or reinspection
Ohsure states on several pages that finished garments are inspected before packing. A buyer that requires third-party inspection, laboratory testing or a particular sampling standard should add that requirement to the order documents rather than assume it is included.
Step 8: Match the shipping method to the launch plan
Ohsure publishes express, air and sea options. One service page describes indicative transit ranges of 3–7 days by express, 7–15 days by air and around one month by sea. Transit estimates depend on destination, route, carrier, customs, seasonal capacity and the selected service.
Before shipment, confirm:
- Final quantity, carton count, gross weight and dimensions
- Packing list, commercial invoice and any required origin or compliance documents
- Consignee and notification details
- Shipping method, carrier or forwarder and route
- Trade term and responsibility for export, import, duties and insurance
- Balance-payment condition and shipment-release condition
- Tracking number, bill of lading or air waybill
- Expected departure and arrival windows
Build buffer between the expected arrival and the commercial launch. A factory completion date is not the same as an in-country delivery date.

Step 9: Close the order with arrival and after-sales records
Ohsure’s service workflow states that sales staff track logistics, notify the customer before expected arrival and confirm quality and quantity after receipt. It also describes escalation to an after-sales team when a quality problem is reported.
On arrival, the buyer should record carton condition, received quantity, visible damage and any random product checks. If a problem is found, preserve carton labels, product codes, photographs, quantities and inspection evidence. Submit the claim within the agreed reporting period and separate manufacturing defects from transit damage or local handling issues.
A useful project closeout also records what should remain unchanged for a reorder: pattern version, material code, color standard, label files, packaging, measurement chart and approved workmanship reference.
Buyer-controlled approval gates
| Approval gate | Do not advance until |
|---|---|
| Inquiry to sampling | Sample purpose, material assumptions, fee, timing and revision scope are clear |
| Sample to bulk quotation | Fit, measurements, construction, materials and branding are approved or exceptions are listed |
| Deposit to material purchasing | Quantities, prices, payment, trade terms and order specifications are signed off |
| Materials to cutting | Required colors, strike-offs, bulk fabric or pre-production controls are approved |
| Production to packing | Inspection criteria and packaging details are confirmed |
| Packing to shipment | Final inspection, quantities, documents, payment and shipping instructions are complete |
Frequently asked questions
What should I send Ohsure in my first inquiry?
Send the product category, reference images or tech pack, quantities by style and color, size range, fabric and performance requirements, logo and packaging needs, destination market, target dates and price range. State which information is fixed and which is open to recommendation.
Can I start with only an idea or reference photo?
Ohsure’s service pages invite buyers to send ideas and reference images, so an early concept can start a discussion. It may require more design, pattern and material development than a project supported by a complete tech pack, which can change sample cost and timing.
How long does an Ohsure sample take?
Different Ohsure pages currently publish indicative ranges from roughly 7–12 days to 15 days. Confirm the actual date after the factory reviews the product complexity, fabric, custom color, decoration and current sample-room schedule.
When does bulk production begin?
Ohsure’s published workflow places bulk production after sample approval, quotation and invoice approval, deposit receipt, internal order review and material preparation. The contract should define the exact event that starts the production lead time.
Is the approved sample enough for quality control?
It is an important reference but should be paired with the measurement chart, bill of materials, color standards, artwork, tolerances, test requirements and defect criteria. These records make acceptance less subjective.
Does Ohsure arrange shipping?
Ohsure states that it offers shipping options including express, air and sea. The buyer should confirm the route, cost, carrier, trade term, customs responsibility, insurance and documentary requirements for the actual order.
What happens if the bulk order has a quality issue?
Ohsure describes after-sales follow-up and a team for quality problems. The order should still state the claim period, required evidence and available remedies. Document any issue immediately after receipt with quantities, photographs, labels and inspection results.
Bottom line
The Ohsure manufacturing process is best managed as a series of documented approval gates: a complete inquiry, a defined sample scope, controlled sample feedback, a frozen bulk specification, material and production checkpoints, measurable final inspection and confirmed shipping documents. Ohsure’s website provides a useful outline, but public lead-time and workflow statements do not replace a project-specific quotation and contract. Buyers can reduce avoidable cost and delay by keeping one current product version and approving each commercial or technical change in writing.
For project-specific feasibility, sampling, price and scheduling, use Ohsure’s Contact Us or Send Inquiry pages. For supporting due diligence, review the existing B729 guides covering factory facts, company identity, equipment, capacity, history, certifications, quality control and customer fit.